Feasibility of engineering projects. Case in the Colombian public sector

Authors

  • Carlos David Peña Poveda Universidad Pedagógica y Tecnológica de Colombia
  • Hugo Fernando Castro Silva Universidad Pedagógica y Tecnológica de Colombia
  • Torcoroma Velásquez Pérez Universidad Francisco de Paula Santander

DOI:

https://doi.org/10.24054/rcta.v2i36.26

Abstract

There is a high percentage of engineering projects in the public sector that are evaluated based on criteria based on time, cost and scope management, which are classified as failures. The objective of this research is to provide the results obtained in the observation of techniques and tools for managing the schedule, in engineering projects developed in the department of Boyacá -Colombia, during the period 2008 to 2018.Based on these results, a methodology is proposed to study the feasibility of this type of project.This methodology seeks the timely detection of deviations to the key success factors during the project life cycle in order to guarantee the achievement of the proposed objectives.

Downloads

Download data is not yet available.

References

Abdellatif, H., & Alshibani, A. (2019). Major Factors Causing Delay in the Delivery of Manufacturing and Building Projects in Saudi Arabia. Buildings, 9(4), 93. https://doi.org/10.3390/buildings9040093

Adam, A., Josephson, P.-E., & Lindahl, G. (2015). Implications of Cost Overruns and Time Delays on Major Public Construction Projects. Proceedings of the 19th International Symposium on Advancement of Construction Management and Real Estate, 747–758. https://doi.org/10.1007/978-3-662-46994-1_61

Al-Hazim, N., Salem, Z. A., & Ahmad, H. (2017). Delay and Cost Overrun in Infrastructure Projects in Jordan. Procedia Engineering, 182, 18–24. https://doi.org/10.1016/j.proeng.2017.03.105

Alias, Z., Zawawi, E. M. A., Yusof, K., & Aris, N. M. (2014). Determining Critical Success Factors of Project Management Practice: A Conceptual Framework. Procedia - Social and Behavioral Sciences, 153, 61–69. https://doi.org/10.1016/j.sbspro.2014.10.041

Arantes, A., Da Silva, P. F., & Ferreira, L. M. D. F. (2016). Delays in construction projects - Causes and impacts. Proceedings of 2015 International Conference on Industrial Engineering and Systems Management, IEEE IESM 2015, (October), 1105–1110. https://doi.org/10.1109/IESM.2015.7380293

Aziz, R. F., & Abdel-Hakam, A. A. (2016). Exploring delay causes of road construction projects in Egypt. Alexandria Engineering Journal, 55(2), 1515–1539. https://doi.org/10.1016/j.aej.2016.03.006.

Castro Márquez, D.E., Velásquez Pérez, T. & Castro Silva, H.F. 2018. Integración de seguridad y gestión de servicios en el gobierno de las tecnologías de la información. Revista Colombiana de Tecnologías de Avanzada. ISSN: 1692-7257 - Volumen 2 – Número 32.

Cavalieri, M., Cristaudo, R., & Guccio, C. (2019). On the magnitude of cost overruns throughout the project life-cycle: An assessment for the Italian transport infrastructure projects. Transport Policy, 79(April), 21–36. https://doi.org/10.1016/j.tranpol.2019.04.001

Cheng, Y. M. (2014). An exploration into cost-influencing factors on construction projects. International Journal of Project Management, 32(5), 850–860. https://doi.org/10.1016/j.ijproman.2013.10.0 03

Cooke-Davies, T. (2002). The “real” success factors on projects. International Journal of Project Management, 20(3), 185–190. https://doi.org/10.1016/S0263-7863(01)00067-9

Doloi, H., Sawhney, A., Iyer, K. C., & Rentala, S. (2012). Analysing factors affecting delays in Indian construction projects. International Journal of Project Management, 30(4), 479–489. https://doi.org/10.1016/j.ijproman.2011.10.004

Gobernación de Boyaca. (2014). Manual de Procedimientos del Banco Nacional de Programas y Proyectos. 1, 91–105. Retrieved from http://www.boyaca.gov.co/

Heravi, G., & Mohammadian, M. (2019). Investigating cost overruns and delay in urban construction projects in Iran.

International Journal of Construction Management, 0(0), 1–11. https://doi.org/10.1080/15623599.2019.1601394

Jia, G., Yang, F., Wang, G., Hong, B., & You, R. (2011). A study of mega project from a perspective of social conflict theory. International Journal of Project Management, 29(7), 817–827. https://doi.org/10.1016/j.ijproman.2011.04.004

Kerkhove, L. P., & Vanhoucke, M. (2017). Optimised scheduling for weather sensitive offshore construction projects. Omega (United Kingdom), 66, 58–78. https://doi.org/10.1016/j.omega.2016.01.011

Khlaifat, D. M., Alyagoub, R. E., Sweis, R. J., & Sweis, G. J. (2019). Factors leading to construction projects’ failure in Jordon. International Journal of Construction Management, 19(1), 65–78. https://doi.org/10.1080/15623599.2017.1382092

Landauer, M., & Komendantova, N. (2018). Participatory environmental governance of infrastructure projects affecting reindeer husbandry in the Arctic. Journal of Environmental Management, 223(January), 385–395. https://doi.org/10.1016/j.jenvman.2018.06.049

Lee, C., Won, J. W., Jang, W., Jung, W., Han, S. H., & Kwak, Y. H. (2017). Social conflict management framework for project viability: Case studies from Korean megaprojects. International Journal of Project Management, 35(8), 1683–1696. https://doi.org/10.1016/j.ijproman.2017.07.011

Li, T. H. Y., Ng, S. T., & Skitmore, M. (2013). Evaluating stakeholder satisfaction during public participation in major infrastructure and construction projects: A fuzzy approach. Automation in Construction, 29, 123–135. https://doi.org/10.1016/j.autcon.2012.09.007

Liu, Z. zhao, Zhu, Z. wei, Wang, H. jia, & Huang, J. (2016). Handling social risks in government-driven mega project: An empirical case study from West China. International Journal of Project Management, 34(2), 202–218. https://doi.org/10.1016/j.ijproman.2015.11.003

Love, P. E. D., Ahiaga-Dagbui, D. D., & Irani, Z. (2016). Cost overruns in transportation infrastructure projects: Sowing the seeds for a probabilistic theory of causation. Transportation Research Part A: Policy and Practice, 92, 184–194. https://doi.org/10.1016/j.tra.2016.08.007

Martínez Ardila A.C., Carrillo Zambrano E. 2017. Arquitectura empresarial para la gestión de información de productos de desarrollo tecnológico e innovación en un grupo de investigación en Colombia. Revista Colombiana de Tecnologías de Avanzada. ISSN: 1692-7257 - Volumen 2 – Número 30.

Mendoza Bejarano, J.L., Escobar Durango, L.M. & Caicedo Villamizar, S.B. 2019. Actividades de estrategia del servicio de itil v3 como lineamiento para la gestión de servicios médicos bajo modalidad de telesalud. Revista Colombiana de Tecnologías de Avanzada. ISSN: 1692-7257 - Volumen 2 – Número 34.

Niazi, G. A., & Painting, N. (2017). Significant Factors Causing Cost Overruns in the Construction Industry in Afghanistan. Procedia Engineering, 182, 510–517. https://doi.org/10.1016/j.proeng.2017.03.145

Odeh, A. M., & Battaineh, H. T. (2001). Causes of construction delay: Traditional contracts.

International Journal of Project Management, 20(1), 67–73. https://doi.org/10.1016/S0263-7863(00)00037-5

PMI. (2017). Guia de los Fundamentos para la direccion de Proyectos PMBOK (Sexta ed). Retrieved from www.pmi.org

Prasad, K. V., Vasugi, V., Venkatesan, R., & Bhat, N. (2019). Analysis of causes of delay in Indian construction projects and mitigation measures. Journal of Financial Management of Property and Construction. https://doi.org/10.1108/JFMPC-04-2018-0020

Rachid, Z., Toufik, B., & Mohammed, B. (2018). Causes of schedule delays in construction projects in Algeria. International Journal of Construction Management, 0(0), 1–11. https://doi.org/10.1080/15623599.2018.1435234

Rosado Gómez, A.A., Jaimes Fernández, J.C. 2018. Revisión de la incorporación de la arquitectura orientada a servicios en las organizaciones. Revista Colombiana de Tecnologías de Avanzada. ISSN: 1692-7257 - Volumen 1 – Número 31.

S, Vyas Gayatri S, K. S. (2013). Performance Indicators for Construction Project 1. (1), 61–66.

Sala del Consejo Estado. (2016). Concepto Sala de Consulta C . E 1365 de 2001 Consejo de Estado - Sala de Consulta y Servicio Civil. Retrieved from https://www.funcionpublica.gov.co/eva/gestornormativo/norma_pdf.php?i=79773

Sambasivan, M., & Soon, Y. W. (2007). Causes and effects of delays in Malaysian construction industry. International Journal of Project Management, 25(5), 517–526. https://doi.org/10.1016/j.ijproman.2006.11.007

Sanchez, O. P., Terlizzi, M. A., & de Moraes, H. R. de O. C. (2017). Cost and time project management success factors for information systems development projects. International Journal of Project Management, 35(8), 1608–1626. https://doi.org/10.1016/j.ijproman.2017.09.007

Senouci, A., Ismail, A., & Eldin, N. (2016). Time Delay and Cost Overrun in Qatari Public Construction Projects. Procedia Engineering, 164(June), 368–375. https://doi.org/10.1016/j.proeng.2016.11.632

"Sierra, L. A., Yepes, V., & Pellicer, E. (2017). Assessing the social sustainability contribution of an infrastructure project under conditions of uncertainty. Environmental Impact Assessment Review, 67(March), 61–72. https://doi.org/10.1016/j.eiar.2017.08.003"

Velásquez Pérez, T., Pérez Pérez, Y.M. & Flórez, I.C. 2018. Adopción de prácticas de Gobierno de TI en la oficina de Admisiones, Registro y Control UFPSO. Revista Colombiana de Tecnologías de Avanzada. ISSN: 1692-7257 - Volumen 1 – Número 31.

Volden, G. H. (2018). Public project success as seen in a broad perspective.: Lessons from a meta-evaluation of 20 infrastructure projects in Norway. Evaluation and Program Planning, 69(March), 109–117. https://doi.org/10.1016/j.evalprogplan.2018.04.008

Published

2020-10-02 — Updated on 2020-08-01

How to Cite

[1]
C. D. . Peña Poveda, H. F. . Castro Silva, and T. . Velásquez Pérez, “Feasibility of engineering projects. Case in the Colombian public sector”, RCTA, vol. 2, no. 36, pp. 97–108, Aug. 2020.

Most read articles by the same author(s)