Feasibility of engineering projects. Case in the Colombian public sector
DOI:
https://doi.org/10.24054/rcta.v2i36.26Abstract
There is a high percentage of engineering projects in the public sector that are evaluated based on criteria based on time, cost and scope management, which are classified as failures. The objective of this research is to provide the results obtained in the observation of techniques and tools for managing the schedule, in engineering projects developed in the department of Boyacá -Colombia, during the period 2008 to 2018.Based on these results, a methodology is proposed to study the feasibility of this type of project.This methodology seeks the timely detection of deviations to the key success factors during the project life cycle in order to guarantee the achievement of the proposed objectives.
Downloads
References
Abdellatif, H., & Alshibani, A. (2019). Major Factors Causing Delay in the Delivery of Manufacturing and Building Projects in Saudi Arabia. Buildings, 9(4), 93. https://doi.org/10.3390/buildings9040093
Adam, A., Josephson, P.-E., & Lindahl, G. (2015). Implications of Cost Overruns and Time Delays on Major Public Construction Projects. Proceedings of the 19th International Symposium on Advancement of Construction Management and Real Estate, 747–758. https://doi.org/10.1007/978-3-662-46994-1_61
Al-Hazim, N., Salem, Z. A., & Ahmad, H. (2017). Delay and Cost Overrun in Infrastructure Projects in Jordan. Procedia Engineering, 182, 18–24. https://doi.org/10.1016/j.proeng.2017.03.105
Alias, Z., Zawawi, E. M. A., Yusof, K., & Aris, N. M. (2014). Determining Critical Success Factors of Project Management Practice: A Conceptual Framework. Procedia - Social and Behavioral Sciences, 153, 61–69. https://doi.org/10.1016/j.sbspro.2014.10.041
Arantes, A., Da Silva, P. F., & Ferreira, L. M. D. F. (2016). Delays in construction projects - Causes and impacts. Proceedings of 2015 International Conference on Industrial Engineering and Systems Management, IEEE IESM 2015, (October), 1105–1110. https://doi.org/10.1109/IESM.2015.7380293
Aziz, R. F., & Abdel-Hakam, A. A. (2016). Exploring delay causes of road construction projects in Egypt. Alexandria Engineering Journal, 55(2), 1515–1539. https://doi.org/10.1016/j.aej.2016.03.006.
Castro Márquez, D.E., Velásquez Pérez, T. & Castro Silva, H.F. 2018. Integración de seguridad y gestión de servicios en el gobierno de las tecnologías de la información. Revista Colombiana de Tecnologías de Avanzada. ISSN: 1692-7257 - Volumen 2 – Número 32.
Cavalieri, M., Cristaudo, R., & Guccio, C. (2019). On the magnitude of cost overruns throughout the project life-cycle: An assessment for the Italian transport infrastructure projects. Transport Policy, 79(April), 21–36. https://doi.org/10.1016/j.tranpol.2019.04.001
Cheng, Y. M. (2014). An exploration into cost-influencing factors on construction projects. International Journal of Project Management, 32(5), 850–860. https://doi.org/10.1016/j.ijproman.2013.10.0 03
Cooke-Davies, T. (2002). The “real” success factors on projects. International Journal of Project Management, 20(3), 185–190. https://doi.org/10.1016/S0263-7863(01)00067-9
Doloi, H., Sawhney, A., Iyer, K. C., & Rentala, S. (2012). Analysing factors affecting delays in Indian construction projects. International Journal of Project Management, 30(4), 479–489. https://doi.org/10.1016/j.ijproman.2011.10.004
Gobernación de Boyaca. (2014). Manual de Procedimientos del Banco Nacional de Programas y Proyectos. 1, 91–105. Retrieved from http://www.boyaca.gov.co/
Heravi, G., & Mohammadian, M. (2019). Investigating cost overruns and delay in urban construction projects in Iran.
International Journal of Construction Management, 0(0), 1–11. https://doi.org/10.1080/15623599.2019.1601394
Jia, G., Yang, F., Wang, G., Hong, B., & You, R. (2011). A study of mega project from a perspective of social conflict theory. International Journal of Project Management, 29(7), 817–827. https://doi.org/10.1016/j.ijproman.2011.04.004
Kerkhove, L. P., & Vanhoucke, M. (2017). Optimised scheduling for weather sensitive offshore construction projects. Omega (United Kingdom), 66, 58–78. https://doi.org/10.1016/j.omega.2016.01.011
Khlaifat, D. M., Alyagoub, R. E., Sweis, R. J., & Sweis, G. J. (2019). Factors leading to construction projects’ failure in Jordon. International Journal of Construction Management, 19(1), 65–78. https://doi.org/10.1080/15623599.2017.1382092
Landauer, M., & Komendantova, N. (2018). Participatory environmental governance of infrastructure projects affecting reindeer husbandry in the Arctic. Journal of Environmental Management, 223(January), 385–395. https://doi.org/10.1016/j.jenvman.2018.06.049
Lee, C., Won, J. W., Jang, W., Jung, W., Han, S. H., & Kwak, Y. H. (2017). Social conflict management framework for project viability: Case studies from Korean megaprojects. International Journal of Project Management, 35(8), 1683–1696. https://doi.org/10.1016/j.ijproman.2017.07.011
Li, T. H. Y., Ng, S. T., & Skitmore, M. (2013). Evaluating stakeholder satisfaction during public participation in major infrastructure and construction projects: A fuzzy approach. Automation in Construction, 29, 123–135. https://doi.org/10.1016/j.autcon.2012.09.007
Liu, Z. zhao, Zhu, Z. wei, Wang, H. jia, & Huang, J. (2016). Handling social risks in government-driven mega project: An empirical case study from West China. International Journal of Project Management, 34(2), 202–218. https://doi.org/10.1016/j.ijproman.2015.11.003
Love, P. E. D., Ahiaga-Dagbui, D. D., & Irani, Z. (2016). Cost overruns in transportation infrastructure projects: Sowing the seeds for a probabilistic theory of causation. Transportation Research Part A: Policy and Practice, 92, 184–194. https://doi.org/10.1016/j.tra.2016.08.007
Martínez Ardila A.C., Carrillo Zambrano E. 2017. Arquitectura empresarial para la gestión de información de productos de desarrollo tecnológico e innovación en un grupo de investigación en Colombia. Revista Colombiana de Tecnologías de Avanzada. ISSN: 1692-7257 - Volumen 2 – Número 30.
Mendoza Bejarano, J.L., Escobar Durango, L.M. & Caicedo Villamizar, S.B. 2019. Actividades de estrategia del servicio de itil v3 como lineamiento para la gestión de servicios médicos bajo modalidad de telesalud. Revista Colombiana de Tecnologías de Avanzada. ISSN: 1692-7257 - Volumen 2 – Número 34.
Niazi, G. A., & Painting, N. (2017). Significant Factors Causing Cost Overruns in the Construction Industry in Afghanistan. Procedia Engineering, 182, 510–517. https://doi.org/10.1016/j.proeng.2017.03.145
Odeh, A. M., & Battaineh, H. T. (2001). Causes of construction delay: Traditional contracts.
International Journal of Project Management, 20(1), 67–73. https://doi.org/10.1016/S0263-7863(00)00037-5
PMI. (2017). Guia de los Fundamentos para la direccion de Proyectos PMBOK (Sexta ed). Retrieved from www.pmi.org
Prasad, K. V., Vasugi, V., Venkatesan, R., & Bhat, N. (2019). Analysis of causes of delay in Indian construction projects and mitigation measures. Journal of Financial Management of Property and Construction. https://doi.org/10.1108/JFMPC-04-2018-0020
Rachid, Z., Toufik, B., & Mohammed, B. (2018). Causes of schedule delays in construction projects in Algeria. International Journal of Construction Management, 0(0), 1–11. https://doi.org/10.1080/15623599.2018.1435234
Rosado Gómez, A.A., Jaimes Fernández, J.C. 2018. Revisión de la incorporación de la arquitectura orientada a servicios en las organizaciones. Revista Colombiana de Tecnologías de Avanzada. ISSN: 1692-7257 - Volumen 1 – Número 31.
S, Vyas Gayatri S, K. S. (2013). Performance Indicators for Construction Project 1. (1), 61–66.
Sala del Consejo Estado. (2016). Concepto Sala de Consulta C . E 1365 de 2001 Consejo de Estado - Sala de Consulta y Servicio Civil. Retrieved from https://www.funcionpublica.gov.co/eva/gestornormativo/norma_pdf.php?i=79773
Sambasivan, M., & Soon, Y. W. (2007). Causes and effects of delays in Malaysian construction industry. International Journal of Project Management, 25(5), 517–526. https://doi.org/10.1016/j.ijproman.2006.11.007
Sanchez, O. P., Terlizzi, M. A., & de Moraes, H. R. de O. C. (2017). Cost and time project management success factors for information systems development projects. International Journal of Project Management, 35(8), 1608–1626. https://doi.org/10.1016/j.ijproman.2017.09.007
Senouci, A., Ismail, A., & Eldin, N. (2016). Time Delay and Cost Overrun in Qatari Public Construction Projects. Procedia Engineering, 164(June), 368–375. https://doi.org/10.1016/j.proeng.2016.11.632
"Sierra, L. A., Yepes, V., & Pellicer, E. (2017). Assessing the social sustainability contribution of an infrastructure project under conditions of uncertainty. Environmental Impact Assessment Review, 67(March), 61–72. https://doi.org/10.1016/j.eiar.2017.08.003"
Velásquez Pérez, T., Pérez Pérez, Y.M. & Flórez, I.C. 2018. Adopción de prácticas de Gobierno de TI en la oficina de Admisiones, Registro y Control UFPSO. Revista Colombiana de Tecnologías de Avanzada. ISSN: 1692-7257 - Volumen 1 – Número 31.
Volden, G. H. (2018). Public project success as seen in a broad perspective.: Lessons from a meta-evaluation of 20 infrastructure projects in Norway. Evaluation and Program Planning, 69(March), 109–117. https://doi.org/10.1016/j.evalprogplan.2018.04.008
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2020 REVISTA COLOMBIANA DE TECNOLOGIAS DE AVANZADA
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.